Power System Master Plan for a Single 50-Acre Greenfield Tech Park in Hinjewadi Phase 4, Pune
You will write the full power system master plan for a 50-acre tech park (12 buildings × 35,000 sq m G+15 Grade A office) in Hinjewadi Phase 4, Pune. **This project is specifically designed to trigger a revision…
You hand in: A 32–40 page PDF master plan with: executive summary, demand model, regulatory framework, 4 supply architecture options with LCOE, recommended option, regulatory pathway with timeline, tenant SLA framework, risk register, statutory…
Smart Grid Transformation Roadmap for a Single DISCOM (BSES Rajdhani Power, 36-Month Horizon)
You will write the smart grid transformation roadmap for BSES Rajdhani Power (BRPL — 22 lakh consumers in South + West Delhi, ~4,500 MU annual sale, current AT&C losses 8.5%).
You hand in: A 38–48 page PDF transformation roadmap with: current-state, target-state, 36-month Gantt, capex + funding schedule, ARR impact + sensitivity, regulatory pathway, organisational change, risk register, governance cadence, board-readable…
AI in Power Systems Strategy: Load Forecasting, Fault Detection, and Outage Management for a Single SLDC
You will write the AI-in-power-systems strategy for a single SLDC (Tamil Nadu Transmission Corporation — TANTRANSCO SLDC at Chennai, ~16,500 MW peak demand, 360 substations monitored).
You hand in: A 36–44 page PDF strategy with: executive summary, current capability + AI readiness, 3 use-case proposals (data, model, accuracy, capex, value), financial case with sensitivity, MLOps and data-governance architecture, regulatory pathway…